Building Control Functions
- Supervise the development of housing areas and council controlled areas as determined and approved.
- Supervise the construction and renovation of buildings in accordance with established laws and regulations.
- Enforce acts and laws adopted by MDKT such as Act 133, Roads, Drains and Buildings 1974 and Uniform Building By-Laws 1984.
- Prepare site plans / working sketches related to development projects.
Building Control Customer Charter
- Customer complaints are resolved within 14 days of receipt, if they do not involve high costs.
- Applications for approval of new building plans will be approved within 51 days provided that they comply with the requirements of the departments involved and are accompanied by complete documents.
- Applications for approval of alteration and addition plans will be approved within 2 weeks provided that they comply with the requirements of UBBL 1984.
Required documents
- Application letter showing original letterhead and reference number as well as construction proposal.
- A copy of the land title deed or land grant certified true by a commissioner of oaths or a Justice of the Peace
- A copy of any valid document such as a power of attorney/sale and purchase agreement/rental agreement if the owner is different from the name listed on the land title deed/land grant.
- 6 sets of neatly arranged and folded building plans in A4 size provided by a certified consultant (i.e. registered architect/engineer and draftsman according to their respective limits).
General information requirements in the plan
- The title of the plan should contain the following:
- Building type
- Total units
- Number of floors
- Lot/land grant number
- Street name
- Section name
- Owner and company name
- Clearly show the building owner's address
- The building plan must be complete and contain the following information:
- A clear location plan and site plan with a scale of not less than 1:1000 or larger as appropriate. The name of the road leading to the proposed site should be indicated in the site plan
- Floor plan, elevation (front, back and side), section and roof plan with a scale of 1:100 or 1:200 (depending on the size of the building)
- Drainage and sewerage layout plan clearly shown in the site plan
- Layout plan of roads, driveways and parking areas as well as traffic flow shown in the site plan or separately
- Show the following calculations: plot ratio, parking space count (cars, motorcycles and lorries where applicable), garbage dump capacity count.
- Clearly indicate the displacement of the building from the land boundary that complies with City Hall requirements.
- Clearly show the estimated floor area of the building according to use such as residential, office, commercial and others for the purpose of calculating plan processing fees.
- All plans must be signed by the consultant, building owner and property owner.
The land and signature must be original. - All drawings must be fully colored.
- Form B1 must be completed and stamped on the first page of the submitted set of building plans.
Workflow chart for processing building plan approval applications
| 1 | Consultant prepares plan and submits to MDKT |
| 2 | The plan will be reviewed to see if it complies with the basic requirements for submitting a plan. |
| 3A | If it is incomplete, prepare a rejection letter and send it to the consultant. |
| 3B | If OK, open the file, calculate the payment for processing the plan and send a payment notice to the consultant. |
| 4 | The plan is distributed to the relevant departments i.e. the Fire Department and Health Department as well as other departments if necessary. |
| 5 | The Fire Department, Health Department and other departments commented on the plan. |
| 6 | The plan will be checked and revised. If the application is doubtful or not, it will be presented to the Building Plan Committee. |
| 7A | If the conditions are not met, a correction letter is prepared and sent to the consultant. |
| 7B | If the conditions are met, an Approval Letter is prepared for signing. |
| 8 | The consultant will be called to take the endorsed plan. |
| 9 | File saved |
For information and clarification, please contact:-
Jabatan Perancangan Pembangunan dan Lanskap
Majlis Daerah Kota Tinggi